Concrete bag calculator

Paste every pour in the job, the pad, the walk and the round post holes, and get the bags to buy, the yards to place and the weight to haul, plus the point where bags stop being the answer.

The pours10x10x4, or p12x36 for a hole
Bags to buy–
Each pour–
Concrete to place–
Weight–
Before you order–

How to use it

  1. Write each pour as length x width x depth in inches, like 10x10x4. Slabs, pads and walkways all go in the same box.
  2. Separate the pours with commas. A pour with only two numbers takes its depth from the box below.
  3. Start a round hole with p and give it all in inches: p12x36 is a hole 12 in across and 36 in deep.
  4. Pick the bag you can actually buy, 40 to 80 lb, and set the waste: ten on formed work, fifteen on rough ground.
  5. Read the bags to buy, the yards to place and the weight to haul. Each pour rounds up to its own last bag.
  6. Watch the last line. Past a yard and a half it tells you to price a short load instead of carrying bags.

A 10 by 10 ft patio 4 in thick, a 6 by 3 ft walk at the same thickness and two gate posts in holes 12 in across and 3 ft deep come to 83 bags of 80 lb mix, 1.79 cu yd, and 6,640 lb to haul. The same job in 60 lb bags takes 109. Past a yard and a half the tool says it out loud: price a short load of ready-mix before you carry that many bags.

Questions

Does the bag weight or the yield decide the count?

The yield, which is the volume of concrete one bag makes once mixed. It is printed on the bag and it is not proportional to the weight, so always divide by the yield figure.

How do I enter a post hole?

Put a p in front and give both numbers in inches: p12x36 is a hole 12 in across and 36 in deep. The count treats it as a cylinder, which is what a dug hole is.

What waste should I use?

Ten percent on a formed slab on level ground. Fifteen on dug footings and uneven subgrade, twenty if the hole is bell shaped. Bags are cheap next to a short pour.

Can I mix bag sizes in one list?

No, the count runs on one bag size at a time, because that is how you buy. Run the list again with the other size and compare the two totals.

Why is the total a bit more than the volume divided by the yield?

Every pour rounds up to its own last bag, because you mix one pour at a time and cannot carry half a bag from one to the next. The difference is a bag or two, and it is the honest number.

Is this the same concrete as a ready-mix truck?

No. Bagged mix is a pre-blended product with its own strength, printed on the bag, and it is made for small work. A truck brings a specified mix in bulk, with a minimum order and a short window to place it.

What people use it for

The bag is a volume, not a weight

A 60 lb bag and an 80 lb bag of the same mix do not make the same amount of concrete. What counts is the yield printed on the bag, which is the volume of mixed concrete one bag makes. The usual figures are 0.30 cu ft for a 40 lb bag, 0.375 for 50 lb, 0.45 for 60 lb and 0.60 for 80 lb. Divide the volume you need by that number and round up. Divide by the weight instead and you come up short.

A cubic yard is 27 cu ft, so one yard takes 45 bags of 80 lb, 60 of 60 lb, 72 of 50 lb or 90 of 40 lb. Nothing about the brand changes that by much, and it is the reason bags stop making sense somewhere around a yard.

Most jobs are more than one pour

The slab is one pour. The footings under the posts are another. The holes themselves are a third. Counted one at a time, that is three trips to the yard and a leftover pile of a mix you cannot match in a fortnight. Paste the whole list here and the count comes back as one number.

A rectangular pour is written as length x width x depth in inches. So 10x10x4 is a 10 by 10 ft slab 4 in thick, and a pour with only two numbers takes the depth from the box below. A round hole starts with p and is all inches: p12x36 is a hole 12 in across and 36 in deep.

Where the count goes wrong

Rough ground eats volume. A formed slab on level ground takes ten percent waste and is fine. An excavated footing that is wider at the bottom, or a hole with a bell in it, can take fifteen or twenty. When the count sits on the line, take the higher one. A spare bag costs less than a cold joint.

The post standing in the hole is not subtracted here. A 4 by 4 takes about a tenth of a 12 in hole, and less of a wider one, so the count runs a little high on posts. High is the side you want to be wrong on.

The number that decides how you buy

Bagged mix is a good answer up to about a yard. Past that the mixing becomes the job: sixty or more bags, water, a wheelbarrow, and a pour that has to be placed and finished before it sets. The last line of the result says where your job lands, and it is not there to sell you anything.

BagYieldBags per cubic yard
80 lb0.60 cu ft45
60 lb0.45 cu ft60
50 lb0.375 cu ft72
40 lb0.30 cu ft90